When Mayor Mamdani’s Commission on Government Efficiency (COGE) released their preliminary report in July 2026, Waterfront Alliance was thrilled that “streamline waterfront permitting” was among the key opportunities for City Charter reform.
The COGE Preliminary Report cited Waterfront Alliance’s 2009 User Guide to Waterfront Permitting, which highlighted the confusing waterfront permitting process going back 17 years ago. Some improvements to the process have been made since then, but one major point of confusion has remained: the opaque process of whether the Department of Small Business Services (SBS) or Department of Buildings (DOB) has jurisdiction over certain waterfront projects.
Waterfront Alliance supports Ballot Measure #4: “Simplify Building Permitting and Move Waterfront Permitting to Department of Buildings,” and here is why—
New York City’s 520 miles of waterfront have been at the forefront of the city’s economic growth for centuries. The waterfront continues to be major driver of growth today, whether it’s through a strong maritime and working waterfront in Red Hook and Staten Island, the largest food distribution center in the world in Hunts Point, the nation’s largest offshore wind port facility in Sunset Park, or modern manufacturing and climate technology at the Brooklyn Navy Yard.
Not only are the waterfronts an economic engine, but they are also rich in recreational opportunities and potential for climate resilience and adaptation solutions. In fact, among the NYC Parks Department’s portfolio, “its beaches, boardwalks, and waterfront parks constitute by far its most expansive category, covering over 7,300 acres or 30 percent of its total land area.”
They are often the most special places in neighborhoods along the shoreline. But they are certainly not perfect across the board. Several communities still have very limited public access to their waterfront, including the South Bronx and North Shore of Staten Island, where Waterfront Alliance is working with community-based partners to unlock public access.
Some of these barriers are social (i.e., a result of historic disinvestment), some of them are physical (i.e., borne out of a post-industrial waterfront legacy), and some of them are a result of a broken waterfront permitting system that makes waterfront projects extremely complicated to plan, design, and build.
Over the years, the control and management of the city’s waterfront permitting has changed hands many times: from the Department of Docks in 1870, to the Department of Ports and Terminals in 1977, and to an eventual home within SBS in 1991. For many reasons, including a decentralization of responsibilities across waterfront land, shifts in the heavy industrial maritime uses along New York City’s waterfront, and consolidation of oversight, SBS became the home for waterfront permitting. Today, as our waterfronts continue to evolve with maritime and industrial uses, recreational boating and open space, climate resilience infrastructure, housing, and public transportation, it is time for a new evolution of waterfront permitting, too.
Two years ago, Waterfront Alliance convened a Waterfront Permitting Symposium to identify common issues in the permitting system for waterfront and coastal development projects in NYC. A common theme from practitioners who attended the Symposium, and who submitted anonymous survey responses, was that the SBS permitting process can be extremely convoluted for every project. There are two main challenges with SBS and its exercise of discretion. First, the agency imposes requirements not rooted in statutory or regulatory requirements, and second, that the requirements themselves may be unnecessary or outside SBS’s scope of authority. In several waterfront projects across the city, building-level technical requirements are often inappropriately applied to waterfront structures, resulting in confusion or additional time and cost for investigations.
When a waterfront project requires approvals administered by SBS, DOB plays a critical role in supporting the review, utilizing its technical expertise to handle the construction-related issues which are routinely evaluated by DOB on projects throughout the city. However, the Charter dictates that SBS must issue the permit, which increases complexity and requires close coordination between agencies before decisions can be issued.
The inapplicability of the Building Code means that projects on public waterfront lots are currently reviewed by SBS, despite SBS’s usual application of the DOB Building Code in its review. The review of construction-level designs for waterfront structures should properly belong with the DOB, and that the DOB’s Waterfront Code initiative presents an opportunity to effect this important change. For these reasons, Waterfront Alliance supports efforts to shift waterfront permits from SBS to DOB.
Lastly, and perhaps most importantly, shifting waterfront permitting from SBS to DOB is a strong start, but streamlining waterfront permitting requires more than just organizational change. Consolidating waterfront permitting within DOB should be accompanied by planning and investment (i.e., additional staff, staff training, and efficient tools and processes for permit tracking) to ensure streamlining. Permit review timelines should be set, enforced, and the new DOB waterfront permitting division must be staffed to handle the volume.
Election Day is Tuesday, November 3, 2026. Polls are open from 6am to 9pm. Early Voting Period is October 24, 2026 – November 1, 2026. For more information, visit: https://www.vote.nyc/elections

